front view
reinforced structure for foundation
foundation ditch
1st stage: foundation basement
floor platform
2nd stage: temporary structure for assembling
3d stage: floor placement
4th stage: 20mm rebar welding
5th stage: top part assembling
unprogrammed alternative uses
plans
axonometries
As part of the Infrastructure to supply the school of Schorge, this watertower has been conceived in connection with the local well and the orchard, within the didactic programme for the children. The process of design and construction has been, once again, in relationship with the local needs, techniques, resources and materials.
The structure is composed of 16+16 20mm concrete rebars welded forming a hyperboloid which acquires a somewhat iconic presence. It bears a 3000 liter water tank on the platform situated 6 meters above the ground. The construction process, although planned very rapidly, was carried out succesfully, with very scarce means, but with an efficient coordination between the designers and the workers.